Table 15: 9012 chassis shipping accessories
Check
Accessory
Usage
VSP 9012 chassis
Ten I/O and Control Processor (CP)
filler panels
Filler panels must be installed in unused slots.
Four Switch Fabric (SF) filler panels
Filler panels must be installed in unused slots.
Two Auxiliary card filler panels
Filler panels must be installed in unused slots.
Regulatory label
Two SF fan trays
Two IO fan trays
One DB9 to DB9 connector
One accessory kit
One cable manager assembly
One generic label accessory kit
Screws and hardware:
The hardware required to mount the chassis in a rack
depends on your rack type.
12 Phillips-head screws
12 clip nuts
Mount the chassis to a rack rail.
Use the clip nuts, if necessary.
4 Phillips-head screws
4 hex nuts
Mount the installation shelf to a rack rail.
4 pan-head screws
Install the cable management bracket.
Installation shelf
Mount the Virtual Services Platform 9000 chassis in an
equipment rack.
One left front cable management
bracket
Manage network interface cables.
Grounding kit hardware
Connects the chassis to the ground of the rack.
The following figure illustrates the accessories in the chassis shipping container.
Virtual Services Platform 9012 chassis
October 2015
Installing the Avaya VSP 9000
70