INSTALLING THE HOOD MOUNTING BRACKET
WARNING
:
WHEN CUTTING OR DRILLING INTO WALL, DO NOT DAMAGE ELECTRICAL WIRING AND OTHER HIDDEN UTILITIES. WHEN
BUILDING FRAMEWORK, ALWAYS FOLLOW ALL APPLICABLE CONSTRUCTION CODES AND STANDARDS.
▪
To construct wood wall framing that is flush with surface of wall studs, ensure that:
a) The framing is centered over installation location and is sturdy enough to support the weight
of the hood.
b) The height of the framing will allow the mounting bracket to be secured to the framing within
the dimensions shown.
▪
After wall surface is finished, carefully center and level the hood mounting bracket, secure it to wall
framing with three 4 x 16 mm mounting screws (that are provided). Tighten the screws completely.
IMPORTANT: Make sure that holes locations are leveled and correctly centered by the vertical centerline (this
installation instruction applies for concrete wall).
WARNING: TWO PEOPLE ARE REQUIRED TO LIFT AND POSITION THE HOOD ONTO THE MOUNTING SCREWS.
INSTALL UPPER CHIMNEY MOUNTING BRACKET
▪
Center the bracket over the hood location and place it flush with the
wall.
▪
Make sure that the slots of the upper chimney are installed
horizontally and level.
▪
Use the upper chimney mounting bracket as a template to mark the
position of its screws.
▪
Drill both screw holes using a 5/16" drill bit. Insert the drywall anchors
(included) into the drilled holes (one per hole).
▪
Secure the upper chimney bracket to the wall using two 4 x 16 mm
mounting screws. Make sure that the bracket is tight against the wall.
WARNING: BE CAREFUL WHEN INSTALLING THE DECORATIVE CHIMNEY AND HOOD, THEY MAY HAVE SHARP
EDGES.
CAUTION: DO NOT REMOVE THE PROTECTIVE PLASTIC FILM COVERING THE DECORATIVE CHIMNEY AT THIS
STAGE.
28
Summary of Contents for NEVADA AVN-368CS2
Page 34: ......