Rug Loom User’s Manual
Loom Assembly
Air System
Page | 29
Figure 13 - Air system
4)
Each air tube will need to be routed to the correct spot on the
loom. Use the included zip ties to attach the tubing to the frame
of the loom so that everything is secure. There are white plastic
anchors installed on the loom for this purpose.
5)
Route the air tubing for the air lift or air compu-dobby up to the
dobby head installed earlier.
6)
Route the air tubing for the brake on the warp beam to the back
of the loom where the warp beam will be installed. If the warp
beam will be in the upper position, the brake will be on the left
side of the loom (when viewed from the weaving position).
7)
Route the remaining air tubing for the tension system to the front
of the loom where the controls for the brake will be on the
weaver’s right.
8)
Place the foot control at the front of the loom and route the tubing
back to the four-way piloted valve. If you have a loom that is 8’ or
wider, you will have two foot controls, one for each side of the
loom.
Note:
If you have additional tubing for optional accessories, check the appendix for
routing instructions.
Manifold
Four-way
piloted valve
Summary of Contents for Rug Loom
Page 2: ......
Page 5: ...Rug Loom User s Manual Introductory Information Page 1 INTRODUCTORY INFORMATION ...
Page 14: ......
Page 15: ...Rug Loom User s Manual Loom Assembly Set Up Page 11 LOOM ASSEMBLY ...
Page 64: ......
Page 84: ......
Page 115: ...Rug Loom User s Manual The Fine Print Removing Cloth from the Loom Page 111 THE FINE PRINT ...