Loom Assembly
Rug Loom User’s Manual
Page | 36
Cloth Storage Beam Assembly
2)
Bring the bundle of springs with chains to the loom. Select one of
these assemblies. Connect the spring end into the remaining
screweye in either of the levers and the chain end into the
screweye opposite.
Note:
You may attach the spring to either the right or the left lever, but you must
attach it to the same side for each harness.
Figure 20 - Harness springs attached to lever
C
LOTH
S
TORAGE
B
EAM
A
SSEMBLY
The beams you are about to install are extremely heavy and we advise you
to have at least two robust adults on hand for handling them. A third person
may be required for beams longer than 8 feet.
1)
Locate the Cloth Storage Beam and the large Drive Gear.
2)
Find the separate box of pillow bearings and mounting hardware.
3)
You will first need to mount the Drive Gear to the right axle of the
Cloth Storage Beam.
4)
Remove the hardware bag marked Cloth Storage Beam from the
box of pillow bearings.
5)
Mount the gear to the axle. First slide the key into the keyway;
then slip the gear over the axle and align its slot with the key;
Summary of Contents for Rug Loom
Page 2: ......
Page 5: ...Rug Loom User s Manual Introductory Information Page 1 INTRODUCTORY INFORMATION ...
Page 14: ......
Page 15: ...Rug Loom User s Manual Loom Assembly Set Up Page 11 LOOM ASSEMBLY ...
Page 64: ......
Page 84: ......
Page 115: ...Rug Loom User s Manual The Fine Print Removing Cloth from the Loom Page 111 THE FINE PRINT ...