OVATION PH 8.3
11
B asic operat ion
2. Basic operation
2.1 First operation / self test
When the unit is switched on via the mains switch (18), a so-
called self-test is performed. The device checks the configu
-
ration and functionality of the installed components. The cur
-
rent status of the hardware test is shown on the display (6).
Upon successful completion of the hardware test, the device
switches to standby mode. This process may take a few
seconds.
2.2 Switching on / standby
Using the power button (1) you can switch between on (ope
-
rate) and standby. When switched on, the display (6) lights up
and the LED (3) is switched off. In standby mode the display
is switched off and the LED is on to indicate that the unit is
still connected to mains.