background image

7

· Place  the    control lever on the upper part.
· Activate  the motor with the installed push-

button.

· Observe the image that is projected on the

screen.  To lower the image the control lever
should be moved downward. The motor
actives and positions the active door as
desired.

· Repeat this operation until reaching the

desired image height.

ATTENTION.

If the whole image is not represented on the
projection screen, this may be due to the fact
that:

• The projector zoom is closed.
• The projector is very near the passive mirror.
• The  active  mirror is excessively closed.

Correct these differences.

The image may not be parallel with the
projection screen base due to height
differences between the place of installation
of the screen and  that of the projector (Fig.
7A).

In the connecting rods that move the active
mirror, (Fig 3 detail 8) there is a connecting
rod-active mirror regulation screw that
corrects the defect. If you want to lift the image,
move the connecting rod screw of the place
affected upwards.  (Fig. 7B)

Remember the adjustment elements that you
have to obtain a cinema image.

1. - Projector zoom and focus.
2. - Vertically adjustable feet, in the projector.
3. - Trapeze correction, manual, automatic or

electronic, in the projector.

4. - Passive mirror turn.
5. - Active mirror movement
6. - Horizontal image control in the connecting

rods.

7. - Left / right movement of the projection

screen (only some makers)

8. - Regulation of the height extension of the

projection screen.

HOW TO ADJUST THE
IMAGE TO THE SCREEN

ATTENTION – DANGER !!

Take out he rubber that blocks the door
during the transport (if you have not already
made it), before triggering the movement
pushbutton of the active mirror gate, make
sure that there are no obstacles hindering
its opening or closing. Do not make any effort
to stop or help the active mirror gate in its
path, the mechanics of the motor can be
seriously damaged and the warranty of the
product will be lost.

If you observe any defect, this may be due
to the handling or lack of care during
transport of Cinema Mirror. Contact your
distributor's technical service.

Activate the button for opening or closing
(not included) on the Cinema Mirror.  The
motor of the active mirror will be put into
operation.

Remove the film that protects the optic
mirrors during transport and pre-installation.

Switch on the projector and wait a few
minutes so that the projector reaches its
maximum brightness.

The light or image thrown by the projector
through the active mirror determines the
place where the projection screen should
be installed.
Remember that you can work on the
projector zoom to fix the screen width.

Install the projection screen guided by the
light spectrum thrown by the projector. If
you use a screen with black side margins,
the image will be better profiled; as television
sets do in their cathode ray tubes.

INSERT A VIDEO OR PC SIGNAL IN
THE INSTALLED PROJECTOR

The control lever of red color regulates the
position and opening of the active mirror
(Fig. 3 detail 2) and consequently, the
projection height on the screen.

figure 7A

figure 7B

INSTRUCTIONS AND TIPS FOR THE INSTALLATION
OF THE HC 37.53 MODEL CINEMA MIRROR

GENERAL RECOMMENDATIONS FOR ASSEMBLY AND INSTALLATION

Summary of Contents for Cinema Mirror HC 37.53

Page 1: ...he image thanks to its two mirrors without causing the trapeze effect on the image For that Cinema Mirror and the screen must be in the same plane or with a difference from 0 to 12 cm Fig 1 Always be...

Page 2: ...n the ceiling at a distance so that it is not within arms reach of a person Secured above the site itself or on a metallic bracket strong enoughtoholdtheweightoftheequipment plustheimageprojector Thee...

Page 3: ...veroftheactivelens 3 3 Protectioncaseoftheelectricequipment 4 Protectioncaseofthemechanic equipment 5 Connectionofthepushing buttonand connection230VAC 6 Passivelens 7 Activelens 8 Closingconnectingro...

Page 4: ...dproceed asfollows Place the projector on a table Connect the electric current to the projector and switch on the projection equipment Leave it for a few minutes so that the projector reaches itsmaxim...

Page 5: ...ivemirrorupsothattheangles between the mirror and the template coincideinparallel Fastenstronglythescrews oftheaxisofthepassivemirror UNPACKAGING AND PROCESS OF ASEMBLY OpentheboxoftheCinemaMirrorandt...

Page 6: ...decorative finish of the ceiling Insert the Cinema Mirror with the optic mirrorsfacingtheplacewheretheprojection screenwillbeinstalled Placethechassisonto the T shapedprofilesofthetechnicalroof ortheH...

Page 7: ...he rubber that blocks the door duringthetransport ifyouhavenotalready made it before triggering the movement pushbuttonoftheactivemirrorgate make sure that there are no obstacles hindering itsopeningo...

Page 8: ...mulationwiththeoriginalceiling ATTENTION PLEASE The motor system activedoor isnotpreparedtocarryheavy loads as for example parts in wood cork glass etc thatonemight wanttoinstallon thedoorasdecoration...

Page 9: ...weightadmitted 5 0Kg Netweight 8 2Kg Grossweightwithpacking 12 3Kg ACTIVE MIRROR DOOR OPTIONALACCESSORIES FrameKitHC635 Fouraluminiumsections squares screws etc to build a frame that replace the techn...

Reviews: