background image

CONNECTION PLATE

Slide the connection plate (red) over the securing holes as shown on pictures and tighten the locking pins 

with the enclosed screwdriver completely.

Summary of Contents for FULLWHITE

Page 1: ...FULLWHITE MANUAL ...

Page 2: ...ce Colors penetrate the projection surface and cannot be cleaned anymore Store the projection surface cleaned and dry at room temperature only When transporting the projection surface at low temperatures do not mount the surface unless it has reached its full elasticity at room temperature Otherwise there is the risk of cold break of the projection screen FOLDED STORAGE The projection surface has ...

Page 3: ...orner parts are designed as a single piece construction with a minimum tolerance thereby ensuring the highest precision Further development of the mobile projection screens for applications where technology plays a sec ondary role and puristic design is required With the minimalistic design this projection screen fits easily in every optical superior installation Universal invisible mounting optio...

Page 4: ...d locking plate into the inner slot according to the picture on the left In case a positive connection is required each clamp connection can be secured with the enclosed red locking plate Stick together each straight frame profile with a clamp connector with the subsequent frame section according to the labels or ...

Page 5: ...CONNECTION PLATE Slide the connection plate red over the securing holes as shown on pictures and tighten the locking pins with the enclosed screwdriver completely ...

Page 6: ... with corner parts on each end Clamp the connection by turning the two clamp screws clockwise and secure the connections with the red locking plates Next plug in the vertical elements clamp and secure them in the same way The vertical connections must always be secured with the locking plates ...

Page 7: ... labels and secure the connections with the two wing nuts 3 Detach the pivot nuts from the top and bottom center support element and insert them into the inner slot of the horizontal frame bar 4 Place the center support and secure it on top and bottom with the Phillips screws ...

Page 8: ...ING The frame now needs to be placed flat onto the backside of the projection surface according to the photo This step has to be carried out with several people to avoid any damage of the projection surface Fold the surface to the backside of the frame and thighten it with the Velcro PROJECTION SURFACE WITH VELCRO PROJECTION SURFACE WITH HOOKS Fold the surface to the backside of the frame thighten...

Page 9: ...ING BRACKET FOR WALL MOUNTING Optional as vertical or horizontal mounting point MOUNTING BRACKET FOR CEILING SUSPENSION MOUNTING POINT FOR LEGS Individually movable mounting points with M8 threaded inserts for legs can be mounted at the back of the frame profile ...

Page 10: ...2 3 1 PIVOT NUTS DISASSEMBLY The dismantling is done in reverse order The black colored clamp points should stay con nected with the frame profile see photo General attachment of pivot Nuts M8 ...

Page 11: ...frame and hooked into the underlying groove easily Using this mounting plates it is no longer neccessary to lay out the surface on the floor These mounting plates are attached to the two pivot nuts M8 in the inner groove and required for the period of assem bly only The mounting plates shall be allocated next to the four corners and the remaining plates should be mounted regularely on the horizont...

Page 12: ......

Reviews: