3.
Install the ductwork so that it is flush to the range hood’s mounting
surface.
4.
Run two-conductor wire from a power source to the hood location. Bring
approximately 12’’
of wiring through wring hole.
5.
Drill 3/32’’diameter pilot holes at points where mounting holes are
marked in cabinet bottom.
6.
Insert 4 mounting screws, leaving approximately 1/4’’ of thread
exposed.
HOOD PREPARATION
1.
Remove the bottom panel of the hood by removing its (7) mounting
screws and set aside.
2.
Punch out the wiring knock-out located on the Top of the Unit.
HOOD PREPARATION-VERTICAL DISCHARGE INSTALLATION
1.
Install the small shutoff plate inside the back of the hood. Using 10
screws