GENERAL
NA Series Operating & Instruction Manual
Page 5
Transport
Check the nameplate on the pump against the receiving and purchase order documents to be sure that the
correct size of pump and materials of construction have been supplied. If a motor has been supplied, check
that the power, speed, and voltage are correct.
Prior to unpacking, check for physical damage to the packing and the pump unit and notify the forwarding
agent
IMMEDIATELY
if any damage is found.
Check that the port covers are intact. If not, check whether foreign objects may have found their way into the
pump casing through the ports. Remove the port covers only when you are ready to connect the pipes to the
pump.
When shipped, the pumps are suitable for short-term storage only. If long-term storage is necessary
before the pump will be put into operation, we suggest that you contact your pump supplier for long-
term storage recommendations.
Check for free rotation of the pump. To check long-coupled pumps for free rotation, remove the coupling
guard and rotate the pump and motor shafts at the flexible coupling.