12
INSTRUCTION MANUAL
_____________________________________________________________________________________________________________________
8. Balance preparation to work
1.
Unpack the balance.
2.
Built-in the scale into horizontal line sector, in place not subjected to mechanical vibrations and strong
air movements.
3.
Using M12 nut set the line sector precisely in axis of existing line with 3
1
mm intervals from both sides.
4.
Connect the ground wire to scale (label on the scale indicates where it should be connected) and
ground the rest of existing line.
5.
Mount read-out module in convenient place.
6. Connect the supply cable plug to socket with protective contact, when balance is unloaded.