21 | 28
3.4
Connecting the inverter
3.4.1
SMA Sunny Boy Storage 3.7 / 5.0 / 6.0
1.
Feed the DC power cable, PE as well as the communication cable(s) through the respective
PG screw glands into the connection compartment of the inverter.
Figure 6:
Connecting the SMA SB Storage to the AXIstorage Li SH
2.
Connect the cables in the inverter according to the Sunny Boy Storage 3.7 / 5.0 / 6.0
operating instructions.
Chapter 6.5: Connecting battery communication cable:
▪
yellow:
CAN H
(E)
▪
white:
CAN L
(D)
▪
orange:
Enable
(B)
▪
blue:
GND
(C)
Chapter 6.1.2: Interior View
▪
Yellow-green Grounding point for grounding the battery (L)
Chap. 6.8 DC connection
▪
Red
(+)
(A+)
▪
Black
(-)
(A-)
It is recommended to use all bridges (30A)
3.
Check all electrical connections
4.
Close the housing of the inverter.