V 2 0 0 2 1 3 E N
S e i t e
20 | 27
3.3.4
Disposal measures
Dispose of transport packaging for recycling in accordance with the statutory provisions.
It is recommended to keep not required parts (patch cables, dummy plugs, screws) together with the
installation instructions near the battery system.
Before removing defective Energypack, the power socket must be taped with insulating tape after
removing the power plug.
3.4
Connecting the inverter
3.4.1
SMA Sunny Boy Storage 3.7 / 5.0 / 6.0
1.
Feed the DC power cable, PE as well as the communication cable(s) through the
respective PG screw glands into the connection compartment of the inverter.
Figure 6:
Connecting the SMA SB Storage to the AXIstorage Li SH
2.
Connect the cables in the inverter according to the Sunny Boy Storage 3.7 / 5.0 / 6.0
operating instructions.
Chapter 6.5: Connecting battery communication cable:
yellow:
CAN H
(E)
white:
CAN L
(D)
red:
Enable
(B)
black:
GND
(C)
Chapter 6.1.2: Interior View
Yellow-green Grounding point for grounding the battery (L)
Chap. 6.8 DC connection
Red
(+)
(A+)
Black
(-)
(A-)
It is recommended to use all bridges (30A)