24
V220308
Warning:
If there is a failure during the self-check, you must first debug the failure and then go to
the next step.
If the “STATUS” lamp shows orange from
the beginning, it means that there has been some
failure in the battery string. The Power relays in the BMS will open, you must debug first.
Note:
The LED lamp will be off after 20sec without any operation.
Caution:
During first time power on, the system will require to do full charge progress for SOC
calibration purpose.
Caution:
it is suggested to fully charge the whole Battery Energy Storage System (BESS) first after
the installation or after long time storage without charging. Depending on the SOC level,
there will be a regularly (3 month) full charge requested during continuous operation as
well. It will be handled automatically by the communication between BESS and the
external device.
3.5.4 Switching the System off
When a failure occurs or before service, you must turn the battery storage system off:
1)
Turn off the inverter or power supply on the DC side.
2)
Turn off the switch between PCS and battery system.
3)
Turn off the
“Power Switch” of the BMS.