13
V220419
3.
Installation
3.1 Required Tools
The following tools are required to install the battery pack:
Wire Cutter
Crimping Modular Plier
Cable Ties
Screwdriver Set
Electric Screwdriver
Adjustable Wrench
Sleeve Piece
600VDC Multimeter
NOTE
Use properly insulated tools to prevent accidental electric shocks or short circuits.
If insulated tools are not available, cover the entire exposed metal surfaces, except their tips, with
available insulated alternatives (insulating tape).
3.2 Safety Gear
It is recommended to wear the following safety gear when dealing with the battery pack
Insulated gloves Safety goggles Safety shoes
Summary of Contents for AXIstorage Li SV2
Page 22: ...19 V220419 ...