Annex 1: Installation and System Turn ON Progress List
Tick after
completion
No.
Item
Remark
☐
1
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Fire-extinguisher System
3.3.4
Grounding System
3.3.5 Clearance
Refer to chapter
3.3
☐
2
Selection of installation sites.
Refer to chapter
3.4.3.
☐
3
Battery base is installed following the technical
requirements.
Refer to chapter
3.4.4.
☐
4
Battery modules installation.
Refer to chapter
3.4.5.
☐
5
Battery system is fixed.
Refer to chapter
3.4.6.
☐
6
Control Module (BMS) and Battery Modules are installed
well.
Refer to chapter
3.4.7.
☐
7
Connect
D+ and D-
between BMS and inverter/PCS or
confluence cabinet.
Refer to chapter
3.5.2.
☐
8
Connect the grounding cable.
Refer to chapter
3.5.1.
☐
9
Double check if every
power cable
,
communication
cable, grounding cable
is installed well.
Refer to chapter
3.5.2 and 3.5.1.
☐
10
Switch the external power or inverter/PCS on, ensure
that all the power equipment can work normally.
Refer to chapter
3.6.4.
☐
11
The first installation should do full charging progress
automatically.
If the status LED of BMS turns to blue, it means this battery
string is operating.