15
3.5 Initial commissioning
Once assembly is complete, test run the machine to ensure it is properly connected to power and
safety components are functioning correctly.
If you find an unusual problem during the test run, immediately stop the machine, disconnect it from
power, and fix the problem BEFORE operating the machine again.
DO NOT start machine until all preceding setup instructions have been performed.
Operating an improperly set up machine may result in malfunction or unexpected results
that can lead to serious injury, death, or machine/property damage.
To test run machine:
1. Clear all setup tools away from machine.
2. Lock all swivel casters on base stand.
3. Connect machine to dust-collection system or place covers over inlet adapter ports.
DO NOT operate the dust collector without first connecting it to a dust-collection
system or covering an inlet adapter port. Otherwise, the lack of airflow resistance
will cause the motor to operate at full amperage load, which could trip your circuit
breaker or blow a fuse.
4. Press Emergency Stop button in.
5. Connect machine to power.
6. Standing away from intake port, press green "I" button to turn machine ON. Verify motor starts up
and runs smoothly without any problems or unusual noises.
8. Press Emergency Stop button to turn machine OFF.
Summary of Contents for AC118CE
Page 1: ...AC118CE Cyclone Extractor AT M 16 08 2019 BOOK REF 007840 Code 105845 Original Instructions ...
Page 3: ......
Page 9: ......
Page 11: ......
Page 17: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 24: ......
Page 27: ...24 8 Diagram and part list 8 1 Diagram ...
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......