Assembling Process for ceiling mount
Preparation stage:
Please remove the four M6*10 Screws on the heater, and use them
for
Step 1.
Step 1:
Adjust the four sliders which inside the track. The distance between the
sliders should be between
14.96in (0.38m) to 31.02in (0.78m). Attach
the Brackets
⑥
with four M6*18 screws, tighten them with ‘L
‘hexagonal wrench
○
10 .
Step 2:
Hook the carabiner at the end of the chains
○
12 through the holes of
the Brackets .The length adjustment range of two Chains
○
12 are
between
19.69in (0.5m) to 29.53in (0.75m).
Complete!