Page 7
SECURE TOP
UNIVERSAL RAIL &
TRIM TOP RAIL
9
INSTALL TOP RAIL
10
• Pre-Drill pilot holes
through the Post Sleeve
and into the post through
holes in the brackets of
the top Universal Rail and
fasten using #10 x 2”
Coated Screws.
• Cut the Top Rail so that
any seams fall at the
center of a post.
Make sure any seams fall at
the center of a post
Pre-Drill 9/64”
#10 x 2”
Coated Screws
• Cut Top Rail so that any
seams fall at the center
of a post. Miter the
planks at corner posts.
• All fastener locations
must be pre-drilled with
a 3/16” drill bit, or
mushrooming or splitting
may occur.
If your rail has stair sections, start installing the cap at the stairs. Wait until all
rail sections are complete before beginning Top Rail installation.
3/4”
1 1/2”
Top Rail Screw Placement
Pre-Drill 3/16”
#8 2 1/2” Coated Screws
Pre-Drill 3/16” through
Universal Rail
Pre-Drill 9/64” through
hole in Universal Rail and
up into Top Rail.
#10 x 1 1/2” Coated
Screws
Installing Evolutions Rail
TM
Contemporary
with CableRail by Feeney
®