www.aztectent.com
Installation Procedure:
40’ Wide
Step 1:
Layout the perimeter pipes, rafter poles, and hip rafter poles and brace
poles on the ground using the included color diagram. The entire
included framework is color coded by length.
Step 2:
Start building the frame by connecting and pinning the four (4) 21’10”
rafter pipes to the 8pt Crown fi tting.
Step 3:
Starting from the crown and working down connect and pin the 14’4”
hip rafters to the Crown. Now connect and pin the 40x Hip Intermediate
to the bottom end of the upper 14’4” hip rafter. Continue by connecting
and pinning the lower four (4) 14’4” hip rafter pipes.
Step 4:
Connect and pin the eight (8) 14’4” Braces to the 40x Hip Intermediate
Fitting.
Summary of Contents for STANDARD FRAME
Page 1: ...STANDARD FRAME PRODUCT MANUAL If YOU can IMAGINE it WE can BUILD it...
Page 27: ...www aztectent com...
Page 43: ......