Operating Instructions BA ULTIMATE
5 Operation
65 56 083 D3560
.
201.10.02.02
21
5.1
Connecting the turbine
Turbine must be at a standstill
CAUTION! Do not remove the handpiece while the turbine is
running.
5.1.1
Highspeed handpiece with fixed connection
Highspeed handpiece with fixed connection
Connecting the highspeed handpiece
1. Attach the highspeed handpiece to the supply hose, observing the
various tube diameters.
2. Screw the screw cap (A) hand-tight. Hold the highspeed handpiece
securely when doing this.
Removing the highspeed handpiece
1. Unscrew and remove the screw cap.
2. Pull the highspeed handpiece off of the supply hose.
6556083.book Seite 21 Montag, 18. April 2016 4:35 16
Summary of Contents for BA 695
Page 2: ...6556083_Titel fm Seite 2 Montag 18 April 2016 5 16 17 ...
Page 4: ...6556083 book Seite 2 Montag 18 April 2016 4 35 16 ...
Page 40: ...6556083 book Seite 38 Montag 18 April 2016 4 35 16 ...
Page 42: ...6556083 book Seite 2 Montag 18 April 2016 4 30 16 ...
Page 78: ...6556083 book Seite 38 Montag 18 April 2016 4 30 16 ...
Page 80: ...6556083_FR book Seite 2 Montag 18 April 2016 4 40 16 ...
Page 116: ...6556083_FR book Seite 38 Montag 18 April 2016 4 40 16 ...
Page 118: ...6556083_ES book Seite 2 Montag 18 April 2016 4 51 16 ...
Page 156: ...6556083_IT book Seite 2 Montag 18 April 2016 5 02 17 ...
Page 192: ...6556083_IT book Seite 38 Montag 18 April 2016 5 02 17 ...
Page 194: ...6556083_NL book Seite 2 Montag 18 April 2016 5 12 17 ...
Page 230: ...6556083_NL book Seite 38 Montag 18 April 2016 5 12 17 ...