Operating Instructions BA ULTIMATE
5 Operation
65 56 083 D3560
.
201.10.02.02
23
Attach and Remove FG _Turbine
Inserting the friction grip bur
✔ The turbine is at a standstill.
1. Press the button and slide the bur in until it reaches the stop.
2. Pull on the bur to check that it is firmly attached.
Removing the friction grip bur
✔ The bur must not be moving.
➢ Press the button and remove the bur.
5.3
Adjusting the cooling spray
Highspeed handpiece with fixed connection
➢ Adjust the cooling spray for the highspeed handpiece with fixed
connection at the treatment unit.
6556083.book Seite 23 Montag, 18. April 2016 4:35 16
Summary of Contents for BA 695
Page 2: ...6556083_Titel fm Seite 2 Montag 18 April 2016 5 16 17 ...
Page 4: ...6556083 book Seite 2 Montag 18 April 2016 4 35 16 ...
Page 40: ...6556083 book Seite 38 Montag 18 April 2016 4 35 16 ...
Page 42: ...6556083 book Seite 2 Montag 18 April 2016 4 30 16 ...
Page 78: ...6556083 book Seite 38 Montag 18 April 2016 4 30 16 ...
Page 80: ...6556083_FR book Seite 2 Montag 18 April 2016 4 40 16 ...
Page 116: ...6556083_FR book Seite 38 Montag 18 April 2016 4 40 16 ...
Page 118: ...6556083_ES book Seite 2 Montag 18 April 2016 4 51 16 ...
Page 156: ...6556083_IT book Seite 2 Montag 18 April 2016 5 02 17 ...
Page 192: ...6556083_IT book Seite 38 Montag 18 April 2016 5 02 17 ...
Page 194: ...6556083_NL book Seite 2 Montag 18 April 2016 5 12 17 ...
Page 230: ...6556083_NL book Seite 38 Montag 18 April 2016 5 12 17 ...