Operating Instructions BA ULTIMATE
4 Preparation
65 56 067 D3560
.
201.09.03.02
21
4
Preparation
4.1
Initial start-up and longer breaks in use
✔ The turbine is only able to reach full power if indicated operating
pressures are set [ → 15]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water and air channels for 30 seconds.
6556067_EN.book Seite 21 Montag, 27. November 2017 12:27 12