5 Operation
Operating Instructions BA ULTIMATE
26
65 56 067 D3560
.
201.09.03.02
5.1.3
Turbine with NSK PTLCL connection
Attaching the turbine
➢ Insert the turbine until it audibly clicks into place.
Removing the turbine
✔ The turbine is at a standstill.
➢ Slide back the sleeve (A) on the quick coupling toward the supply
hose and pull the turbine while turning it slightly. Do not pull on or
hold the supply hose.
6556067_EN.book Seite 26 Montag, 27. November 2017 12:27 12