7 Conditioning
Operating Instructions BA ULTIMATE
42
65 56 067 D3560
.
201.09.03.02
Process
✔ The turbine is cleaned and disinfected.
1. Press the turbine head with the chuck firmly against the spray can
nozzle.
2. Spray the chuck for 1 - 2 seconds.
IMPORTANT: Hold the spray can upright.
3. Wipe any spray that comes out with a disinfection cloth.
6556067_EN.book Seite 42 Montag, 27. November 2017 12:27 12