BDC6000BB
Certifi ed Nanotechnology Whole House Purifi cation System
5
R E A D A N D F O L L O W T H E S E I N S T R U C T I O N S C A R E F U L LY
Hel neu st 57
A. Rules for Safe Installation
1.
Because of possible damage when dealing with highly pressurized water, a professional
should install this system.
2.
This system was assembled for water fl ow from the left to right. Water should always fl ow
through the following fi lters: 6001 fi rst, 6002 second, 6003 third, and fi nally the 6004 cartridge.
B. Before You Begin – Wash your hands thoroughly
1.
There is a master shut-off valve installed in your plumbing line. Most often it is located near
the point where the water enters the building. Use this master valve to shut off the water fl ow to
the entire building prior to installation.
2.
The plastic heads of the BDC-6000BB water purifi cation system housings are tapped in to
the “National Pipe Thread” (NPT). Clean the connecting pipes of all oils before assembly. Do not
over-tighten the pipe into the plastic head or use heat in the vicinity of this system.
# 6002
COUPLER
1” to 1”
METER
1” to 1”
COUPLER
1” to 1”
# 6003
# 6004
FLOW
RESTRICTOR
# 6001
FILTER
WHITE
FITTING
BALL VALVE
1”
BLACK
FITTING
BLACK
FITTING
WHITE
FITTING
MOUNTING
BRACKET
CLAMP