Installation and Operating Instruction for
B.E.G.
- Occupancy detectors PD11-M-1C-FLAT/PD11-S
LUXOMAT
®
PD11-M-1C-FLAT/PD11-S
EN
1. Product information
•
Extremely slim design with spring clips for easy and
time-saving installation directly in suspended ceilings
•
Remote controllable occupancy detector
LUXOMAT
®
PD11-M-1C-FLAT-FC for indoor applications in the version
master with circular detection area
•
One switching channel for switching light
•
Configuration and operation with the optional remote
control possible
LUXOMAT
®
IR-PD-1C (Accessories)
•
Version as Master/Slave
2. Operation
The presence detector controls the light automatically according
to people present (movements) and the ambient brightness.
The integrated light sensor constantly measures the ambient light
and compares it with the brightness level on the detector. If the
ambient light is sufficient, lighting will not be switched on.
If the ambient light level is below the brightness level, a move-
ment activates the lighting in the room.
The detector switch the light off, if there is enough natural light
for 15 min. or until the follow-up time do not recognized any
movement in the room.
3. Safety information
!
Work on the 230 V mains supply may only be car-
ried out by qualified professionals or by instructed
persons under the direction and supervision of quali-
fied skilled electrical personnel in accordance with
electrotechnical regulations.
!
Disconnect supply before installing!
!
This device is not suitable for disconnection.
4. Mounting
A circular opening of diameter 44 mm must be produced in the
ceiling.
Having connected up the
cables in accor dance with
regulations, the detector is
inserted into the opening
as shown in the drawing
opposite and fixed into
position with the assistance
of the spring clips.
For mounting into luminaires
use the supplied clamp ring
and remove the spring clips.
!
In Master-/Slave-operation the master device must
always be installed at location with least daylight.
5. Position LEDs
I
II
III
LED I red
LED II white
LED III green
6. Self test cycle/Startup behavior
The product enters an initial 60-second self-test cycle, when the
supply is first connected. During this time the device does not
respond to movement and stays on.
The initialization mode can be changed by using the remote
control.
After the self-test cycle (60s), the detector is ready for operation.
There are no further settings necessary. The factory settings
of brightness threshold and delay time are explained in the
technical data.
7. Wiring diagram
Standard mode with Master/Slave
N
L
N S R
L‘ L
T1
N
L
R
Slave
Master
!
Connected slaves must have the same phase as the master.
8. Range
2
1
1
quer zum Melder gehen
frontal zum Melder gehen
Unterkriechschutz
Walking across
2
quer zum Melder gehen
frontal zum Melder gehen
Unterkriechschutz
Walking towards
quer zum Melder gehen
frontal zum Melder gehen
Unterkriechschutz
Seated
9 m
6 m
3 m
9 m
360°
2,50 m
9. Exclude sources of interference
If the detection zone is too large, or areas covered that should not
be monitored, use the blinds to reduced or limited those areas.
10. Technical data
Power supply:
110-240 VAC, 50/60 Hz
Power consumption:
ca. 0.35 W
Ambient temperature:
-25°C – +50°C
Degree of protection/class:
IP20 / II
Switching power /
contact:
2300 W cos
ϕ
=1
1150 VA cos
ϕ
= 0.5, µ-Contact
Factory reset:
500 Lux, 10 min.
Recommended height
for mounting:
2 - 3 m
Range of coverage Ø
H 2,50 m / T = 18°C:
seated 3 m / tangential 9 m /
radial 6 m
Area of coverage:
circular 360°
Brightness threshold:
10 - 2000 Lux
Follow-up time:
5 - 30 min.
Settings can be changed by using the optional remote control
Dimensions:
H 60 x Ø 52 mm
Technical data PD11-Slave
Power supply:
110-240 VAC, 50/60 Hz
Impulse output:
Optocoupler max. 2 W
Impulse duration:
9 s
Declaration of Conformity:
This product respects the directives concerning
1. electromagnetic compatibility (2004/108/EU)
2. low voltage (2006/95/EU)
3. restriction of the use of certain hazardous substances in electri-
cal and electronic equipment (2011/65/EU)
WE RECOMMEND LIGHTS SHOULD HAVE A 100HR BURN IN (T5
TUBES OR 80HR FOR T8 TUBES) BEFORE DIMMING OPERATION
TAKE PLACE.
THE LIFESPAN OF THE LAMPS CAN BE REDUCED IF THE BURN IN
DOES NOT TAKE PLACE.
11. Article / Part nr. / Accessory
Articel
FC
PD11-M-1C-FLAT-FC
92583
PD11-S
92593
LUXOMAT
®
Remote control:
IR-PD-1C (incl. wall bracket) 92094
IR-PD-Mini
92159
12. Manual switching
S-terminal:
By pressing the pushbutton, the phase can be given to the S
terminal.
To turn on or off, press the light briefly. The light will remain on
or off, as people are detected plus the follow-up time.
R-terminal:
The R terminal is used for connecting the slave to the master.
Alternatively, the phase can be set by a switch on the R terminal.
If the phase is longer then 10 sec. on, the detector switches to
permanent mode, as long as the pushbutton is closed.
13. LED-functional indicators
LED function indicators after each mains recovery (60sec.
initialisation period)
Operating state
LED function indicators
Factory pro-
gram active
White, red and green flash in quick
succession for 10 sec., then initialisation
indicators, see below
Indicator
unprogrammed
Standard
mode
Red flashes
LED function indicators during operation
Process
LED function indicators
Motion detection
Red flashes on each detec-
ted movement
Too bright detected
Green flashes
Light measurement active
Green flashes once every
10 sec.
44 mm
PD11_NEU_4lang_211014.indd 1
04.12.2014 15:31:03