15
HYDROCLIMA 2 - User Manual
Programming and configuration of the device is carried out by radio, using an RFM-RX2 and BMetering software. To
trigger the configuration procedure, the BMetering software must be properly configured:
Configuration
→ for the factory state of the allocator, press the button for < 1s
→ for the allocator already configured, press the button for > 5s, until the display shows
the message “rF”. The method of configuration the allocator has been described in the documentation
concerning the Bmetering software user manual.
Summary of Contents for HYDROCLIMA 2
Page 1: ...v 1 0...