7
© B&S Commercial Kitchen Appliances Pty Ltd 2016
Commissioning of appliance;
Before commencing an installation, all of the following shall be established;
(a) - The required gas type is available.
(b) - That the gas supply is adequate to satisfy likely simultaneous demands or peak loading.
(c) - That the capacity of the gas measurement system, meter or cylinder supply is sufficient to meet the
anticipated maximum demand.
(d) - The pressure of the gas available at the inlet to the consumer piping.
(e) - The maximum pressure supplied from the outlet of the gas measurement system, meter or cylinder in
the event of failure of the supply regulator or control.
(f) - Location of gas measurement system or meter.
Commissioning of this appliance (within Australia) shall be completed by a suitably authorised person who;
(a) - Installed the appliance when gas is available at the time of installation; or
(b) - makes gas available to the appliance if gas was not available at the time of installation.
The commissioning of an appliance shall take full account of special design features, information contained
in these instructions, and relevant appliance safety requirements.
Standard connecon point dimensions
A1
A2
A3
B1
B2
B3
C1
C2
C3
VUFWW1-A63
655mm
150mm
692mm
577mm
80mm
78mm
465mm
525mm
60mm
VUFWW1-D3
655mm
150mm
692mm
577mm
80mm
78mm
468mm
524mm
67mm
VUFWWSP1-A63 475mm
150mm
692mm
397mm
80mm
78mm
385mm
525mm
60mm
VUFWWSP1-D3
475mm
150mm
692mm
397mm
80mm
78mm
386mm
524mm
67mm
UFWWK
588mm
96mm
777mm
399mm
378mm
47mm
480mm
503mm
93mm
UFWWSPK
407mm
100mm
777mm
300mm
430mm
50mm
300mm
530mm
93mm
UFWWD
588mm
96mm
777mm
399mm
378mm
47mm
480mm
503mm
93mm
UFWWSPD
407mm
100mm
777mm
300mm
430mm
50mm
300mm
530mm
93mm
A2
A1
B1
C1
B2
C2
C3
A3
B3