Test Procedure
© b2 electronic GmbH
DHV0086 Rev06
45
Step
Procedure
(Set manual test parameters)
RS3�2�04: Report Details - Extended
Insulation
(only for cable)
Set insulation:
• XLPE
• TRXLPE
• PILC
• EPR
• EPR (carbon)
• EPR (mineral)
• EPR (dis. res.)
• PE
• PVC
• HYBR
RS3�2�05: Report Details - Extended
Phase
Set phase:
• A
• B
• C
• AB
• AC
• BC
• ABC
RS3�2�06: Report Details - Extended
Company Name
For instructions on how to edit the company
name,
„7.3 Report Naming Instructions“