Test Procedure
© b2 electronic GmbH
DHV0086 Rev06
57
Step
Procedure
(Configure auto test sequence)
NS04: Work Order
For entering a work order number,
activate the keybord. For instructions,
see
7.3 Report Naming Instructions on page
88
NS05: Next Step
Press “Next” to continue.
NS06: DUT
Set DUT:
• Cable
• Motor
• Generator
• Transformer
• Switchgear
• Vacuum bottle
• Other
NS07: Insulation
Set insulation:
• XLPE
• TRXLPE
• PILC
• EPR
• EPR (carbon)
• EPR (mineral)
• EPR (dis. res.)
• PE
• PVC
• HYBR
• Other