Installation & Ope Maintenance 

eleGRIL Level Bed, Mechanically Fastened 

Models: BGE38H, BGE58H, BGE98H.  Frames: BFE38HLBM, BFE58HLBM, BFE98HLBM

 

3

 

 

Great Products. Better Partners. 

Babcock-Davis is a leader in roof hatches, smoke vents and safety railings for the commercial roofing market. We also manufacture architectural 
access and safety-related building products for commercial structures. Babcock-Davis provides local connections through a broad distribution 
network to accelerate and simplify the building process for contractors and building owners, offering hassle-free services including access to 
technical experts, REVIT tools for BIM, HPDs for LEED v4, 3-part specifications and AIA-accredited continuing education courses. 
 

 

(All drain accessories provided by others.)

 

8.

 

When the cement has hardened, install plywood or other material in the recess to 
protect the edges of the frame until it is time to install the grilles.  Wait to install the 
grilles until the building is ready for use. 

 

INSTALL THE GRILLE  

1.

 

Remove the plywood or other filler from the recess and clean the recess thoroughly. 
Note that debris will cause irregularities in the recess that will in turn cause the grille 
to rock or create a tripping hazard. 

2.

 

Refer to the shop drawings and the marks on the sections to determine the correct 
location of each section.  Note that the grille sections are not interchangeable.  

3.

 

Refer to the following hold-down illustration below while assembling hold-downs. 
Place the stainless-steel 
screws in all hold-downs on 
the grille sections. Use the 
plastic washers provided to 
hold the screws in the lock-
downs before putting the 
grilles into the recess. 

 

DO NOT attempt to put the 
lock-down screws in by prying 
apart the surface wires and 
installing from the top of the 
grille.  This will cause irreversible damage that is not covered by the warranty. 

4.

 

Placement of Hold Down Clips  

First install clips at each corner of each grille section.  Clips should be placed 
approximately 4 inches to 6 inches in from each side.  Continue placing clips uniformly 
along the perimeter and throughout the entire grate section.  Clips should be spaced 
evenly from 18 inches to 24 inches apart. 

5.

 

Installation of Hold Down Clips 

Place the clip in the frame at an angle and use a pry bar to insert the clip into the 
frame. 

(See Figure 1).  

Press/Tap the clip into place using a flat head screwdriver so the 

fingers of the clips snap into the space between the surface wires. 

(See Figure 2).

 

 
 
 
 