Application of
Disassembly
3 - 86
Embroidery unit
Application o
f
Disassembly
Application of Disassembly
5
Removal of EMB relay PCB assy
1. Remove the screw (taptite, cup B M4x14) to remove the relay PCB holder from the ES base cover unit.
Unlock the lock to disconnect the flexible flat cable:SML2CD-7. Disconnect the flexible flat
cable:SML2CD-6 and four connectors from the EMB relay PCB assy.
2. Remove the four screws (screw, pan (S/P washer) M3x6) to remove the EMB relay PCB assy from the
relay PCB holder.
Screw, Pan (S/P washer) M3X6
Taptite, Cup B M4X14
Main frame assy
Screw, pan
(S/P washer) M3x6
Taptite, cup B M4x14
Relay PCB holder
EMB relay PCB assy
Connector
Connector
Connector
Flexible flat cable:
SML2CD-6
Flexible flat cable:
SML2CD-7
ES base cover unit
Connector
Summary of Contents for BLDY
Page 2: ......