Application of
Disassembly
3 - 100
Embroidery unit
Application o
f
Disassembly
Application of Disassembly
18
Removal of Timing belt
1. Remove the two screws (screw, pan (S/P washer) M4x8) to remove the X belt presser from the X
carriage assy.
2. Remove the two screws (screw, pan (S/P washer) M4x8) to remove the tension pulley assy from the
main frame assy, and remove the timing belt 40S2M676.
Screw, Pan (S/P washer) M4X8
Main frame assy
Timing belt 40S2M676
X belt presser
Screw, pan (S/P washer) M4x8
Screw, pan (S/P washer)
M4x8
Tension pulley assy
X carriage assy
Summary of Contents for BLDY
Page 2: ......