Basic of
D
isassembly
Basic of Disassembly
2 - 13
Main frame and covers
Basic of
D
isassembly
10
Removal of LED PCB holder A/B
1. Release the clip to unbind the lead wires. Disconnect the lead wire assy LED1 from the main PCB assy
and release the lead wire assy LED1 from the two guides. Then disconnect the two connectors of lead
wire assy LED1 from the two LED PCB assy:work areas.
2. Remove the screw (taptite, bind S M4x10) to remove the LED PCB holder A. Remove the screw
(screw, pan (S/P washer) M3x7) to remove the LED PCB assy:work area from the LED PCB holder A.
3. Remove the screw (taptite, bind S M4x10) to remove the LED PCB holder B. Remove the screw
(screw, pan (S/P washer) M3x7) to remove the LED PCB assy:work area from the LED PCB holder B.
Taptite, Bind S M4X10
Screw, Pan (S/P washer) M3X7
LED PCB holder B
Screw, pan
(S/P washer) M3x7
Guides
LED PCB holder A
Taptite, bind
S M4x10
LED PCB assy:
work area
Lead wire assy LED1
Taptite, bind
S M4x10
LED PCB assy:
work area
Clip
Main PCB assy
Summary of Contents for BLDY
Page 2: ......