Basic of
D
isassembly
Basic of Disassembly
2 - 17
Electric parts and Main motor unit
Basic of
D
isassembly
2
Removal of Main motor assembly
1. Remove the T belt from the timing pulley of upper shaft assy and the motor T-pulley of main motor
assembly.
2. Disconnect the connector of main motor assembly lead wire from the power PCB assy of power unit.
3. Release the clip to unbind the main motor assembly lead wire.
4. Remove the two screws (upset M4x12DB) to remove the main motor assembly.
Refer to 3 - 28 Disassembly of Main motor assembly.
Upset M4X12DB
Power PCB assy
Timing pulley
Connector of
main motor
assembly lead wire
T belt
Main motor
assembly
Upset
M4x12DB
Motor T-pulley
Power unit
Main motor assembly
lead wire
Clip
Summary of Contents for BLDY
Page 2: ......