19
Installing the
Power Cord
Insert the cord into top power connector on the
rear of the machine. Plug the three-prong end into
a power source (see Figure 9).
The lower power connector is for powering other
attachments. (For future development.)
Turning on the Baby Lock Crown Jewel III
There are two power switches for your machine.
The main power switch is at the rear of the ma-
chine and a red power switch is under the right
handlebar at the front of the machine for your
added convenience (see
Figure 10
).
The machine is turned on when both switches are
turned on. The machine is turned off when both
switches are off. However, you may turn off the
machine functions by turning off only the front
switch if you will be returning to quilt within a day.
Turn on the back switch first by toggling the switch
from the “0” position to the “1” position. Then
turn on the front switch by toggling it as well. The
front switch will not turn on the machine unless
the back switch is already on.
IMPORTANT
: If you will not be using the ma-
chine for more than a day, we recommend you
turn off both switches and unplug the power cord
from the power source.
IMPORTANT
: Refer to the safety instructions.
Eyelets
Figure 11
Installing the
Thread Mast
Locate the threaded hole on top of the machine
near the rear by the handwheel. The thread mast
comes with the washer and nut on it. Remove the
nut and washer, replace the nut onto the mast and
then place the washer under the nut and onto the
machine painted surface. The washer protects the
painted surface when the nut is tightened. Tighten
the mast clockwise until it is securely in place. Use
the nut to secure the mast to the machine.
NOTE:
The eyelets of the thread mast
must
be centered over the spool pins—so the cone
will not pull, turn or tilt, causing thread
tension problems (
Figure 11
).
Figure 9
Figure 10
Summary of Contents for Crown Jewel III BLCJ18-3
Page 1: ...3 ...