3 - 95
Main unit
Main unit
Assembly
8
Tension base attachment
1. Attach the tension base assembly
1
to the needle bar case final assembly
with the 4 screws
1
.
2. Attach the cord clamp (NK-4N) to the tension base cord at a point 125 mm
from the tension base, and secure it to the arm bed with the screw
2
.
1
Torque
1.18 – 1.57 N-m
2
Torque
0.78 – 1.18 N-m
2
1
1
Screw, Bind
M
4X6
Screw, Pan (S/P washer)
M
4X10DB
18
Summary of Contents for EMP6
Page 1: ...EMP6 BMP8 Technical Training...
Page 16: ...2 55 Disassembly Power unit Main unit 15...
Page 18: ...2 73 Disassembly Operation panel Main unit 17...
Page 44: ......