TODDLER RAIL ASSEMBLY INSTRUCTIONS
Page 3 of 4
STEP 1
STEP 2
Note: The Mattress Support (6) is easily
adjustable to varying heights by loosening and
removing all of the hardware from all four corners
of the current level and inserting into a different
hole for higher or lower level.
Ensure that the Mattress Support (6) is in the
lowest position before installing the Toddler Rail.
Remove Stationary Side Rail (5) from the crib by
carefully unscrewing and removing the (4pcs)
short bolts with spring washer on Left /Right
sides of the Stationary Side Rails (5) using Allen
Key (KK). Please keep the hardware for the use in
Step 4.