44
The following are installation instructions for adding new field connections (Equalizer/
Bypass/Outlet) on a cold water basin with the TriArmor
®
Corrosion Protection System.
1. Use the BAC template provided with the accessory to layout and mark the hole pattern
on the exterior of the cold water basin.
2. Drill a pilot hole from the outside of the cold water basin to the inside of the cold
water basin.
3. On the inside of the cold water basin:
a. For connections 3” or less, score the TriArmor
®
Corrosion Protection System with a
hole saw as shown in
Figure 11
.
b. For connections 3” or greater, proceed to step 4.
4. Cut the hole from the outside of the cold water basin.
a. Use a hole saw or a step drill bit for smaller connections 3” or less as shown in
Figure 12
.
b. Use a reciprocating saw or a Sawzall
®
for larger connections 3” or greater.
5. Position the BAC supplied stainless steel backing ring gasket to the inside of the cold
water basin.
6. Position the flange to the outside of the cold water basin.
7. Bolt the flange and the stainless steel backing plate together using stainless steel bolts.
8. Seal any exposed galvanized steel of the connection inside the cold water basin
with Vulkem
®
Caulk as shown in
Figure 13
.
Supplies Provided by BAC
Recommended Supplies Provided by Others
Template for the connection with bolt holes
Stainless steel threaded shoulder bolts
Type 304 stainless steel backing ring with gasket 150 lb flange, weld any piping to the flange prior to installation
Vulkem
®
Caulk
Gasket for the outside of the cold water basin
Table 7.
Supplies for Installing Field Connections
Figure 11.
Scored TriArmor
®
Corrosion Protection System
Figure 12.
Removal Material
NOTE:
BAC recommends adding a
flange connection for field installed
equalizers, bypass and outlet
connections. Please order the
recommended supplies listed in
Table 4
prior to unit shutdown.
Figure 13.
Caulk Exposed Galvanized Steel
FXV, FXV3, CXVB, AND CXVT
Installation Instructions
for Field Connections
8