Top Perimeter Guardrail to Fill Platform - PFi Only (Optional)
1. Attach the upper ladder supports PJF to the ladder(s) if not already installed and then
attach the ladder assembly to the platform using the 3/8” bolts provided. See
Figure
63, Detail B
.
2. Secure the ladder flares to the railing posts using the 5/16” bolts provided. See
Figure 63, Detail A
.
3. Install the lower Mechanical section ladder supports PJG using the 3/8” bolts
provided. Secure to the ladder(s) using ladder clamps PDC. See
Figure 63, Detail C
.
4. Secure the ladder(s) to the factory installed bracket(s) on the Fill Platform with the
ladder clamps PDC and PDB. Use the 3/8” bolts provided. See
Figure 63, Detail D
.
Figure 63.
Top Perimeter Guardrail Ladder to Fill Platform-
PFi 1212, 1224, 2412, 2424, 1218, 1236, 2418, 2436,
1220, 1240, 2420, 2440
Detail B
Detail C
Detail D
Detail A
PJF
PJF
PJG
PDC
PDC
PDB
NOTE:
Not all units receive supports
at this location.
NOTE:
The total quantity of ladders
depends on the unit configuration.