RIGGING
General Notes
1. The equipment arrives on site by truck.
A crane must always be used to unload the unit from the truck. Do not attempt to unload the unit using a forklift.
2. Spreader bars of the full width of the section must be used between the lifting cables to prevent damage to the
section.
3. For extended lifts or where hazards exist, it is recommended to use the lifting devices in conjunction with
safety slings placed under the unit.
4. For each unit, only one lift is required. Lifting ears are foreseen on each unit.
5. Attach the lifting devices to the unit as per rigging methods below. Do not use lifting hooks to lift the unit, use
shackles (max. Ø 39mm) as shown on below picture. Unload the unit from the truck.
Use shackles (max. Ø 39mm) to lift the unit
6. Install the unit in its final position and anchor to the support beams (supplied by others).
Caution
BEFORE AN ACTUAL LIFT IS UNDERTAKEN, ENSURE NO WATER, SNOW, ICE OR DEBRIS
HAS COLLECTED IN THE UNIT. SUCH ACCUMULATIONS WILL ADD SUBSTANTIALLY TO THE
EQUIPMENT'S LIFTING WEIGHT.
8
SP
2
2 Rigging
2 Rigging
Summary of Contents for SP2B series
Page 1: ...SP Adiabatic Cooler RIGGING AND INSTALLATION INSTRUCTIONS RSPv07EN SA...
Page 11: ...All 6 fan units W W W B A L T I M O R E A I R C O I L C O Z A 11 2 Rigging 2 Rigging...
Page 21: ...W W W B A L T I M O R E A I R C O I L C O Z A...
Page 22: ...W W W B A L T I M O R E A I R C O I L C O Z A...
Page 23: ...W W W B A L T I M O R E A I R C O I L C O Z A...
Page 24: ...W W W B A L T I M O R E A I R C O I L C O Z A...
Page 25: ...W W W B A L T I M O R E A I R C O I L C O Z A...