background image

 

5

 

 

 

V1.05 Revised 03/16/2021 

Figure 1.1.1 

Figure 1.1.2 

Figure 1.1.3 

Operation 

Preparation 

-

 

Connect 220V 3P 60Hz to main disconnect through the cord grip. Tigthen the cord grip to 

ensure the cable doesn’t move.

 (Figure 1.1.1) 

-

 

Remove zip ties on Cat-Track and red shipping brackets. 

-

 

Connect minimum of 80PSI air connection to the regulator. Make sure the regulator is set to 
80PSI to 0.5 Mpa. (Figure 1.1.2) 

-

 

Connect water connection to water connection on the back of the machine. (Figure 1.1.3)  

 

 

 

 

 

Summary of Contents for Miter X

Page 1: ...1 V1 05 Revised 03 16 2021 BACA Miter X Miter machine Operation Manual ...

Page 2: ...2 V1 05 Revised 03 16 2021 Contents Safety 3 Operation 5 Preparation 5 StartUp 6 Standard Operation 6 Maintenance 8 Troubleshooting 9 Electrical 9 Control 10 ...

Page 3: ...and warnings are highlighted for specific operations Safety precautions are also posted on the equipment On site safety and engineering personnel should develop and maintain proper work instructions for this machine which incorporate general and specific safety instructions as found in this manual On site safety and engineering personnel should develop and maintain proper lockout tagout procedures...

Page 4: ...sed after servicing Do NOT use jumper wires across fuses or fuse holders Repair any electrical issue properly before placing the equipment back into service Operators must wear protective equipment when working around the Miter X Operators must wear goggles or safety glasses to guard against spray and flying debris Operators and others exposed to noise levels above 90 dBA for more than 1 hour must...

Page 5: ...e cord grip Tigthen the cord grip to ensure the cable doesn t move Figure 1 1 1 Remove zip ties on Cat Track and red shipping brackets Connect minimum of 80PSI air connection to the regulator Make sure the regulator is set to 80PSI to 0 5 Mpa Figure 1 1 2 Connect water connection to water connection on the back of the machine Figure 1 1 3 ...

Page 6: ...y to be operated Figure 1 2 1 Standard Operation Figure 1 3 1 is the operator station to operate the machine From left to right listed o Raise roller Raise table roller to reduce friction between stone and table Operator can easily move the stone once it raised o Lower Clamp Lower the clamp to make sure the stone is not moving when it s being mittered o Move left carriage Move the cutting unit to ...

Page 7: ... Turn on the water valve o E Stop Stop the saw movement cutting unit movement raise of the roller and the lowered of the clamp Figure 1 3 2 represent the analog display for saw information and saw speed adjustment It will show you the current and the speed of the VFD ...

Page 8: ...ving the stone into position will be easier Align pieces up against the hard stop o Once in position lower the rollers o Engage the clamps to hold pieces in place o Make sure the potentiometer speed knob is set to zero o Turn on the motor and water o Depress the blue button to engage the carriage moves to the right to begin cutting o Slowly turn up the speed knob to increase the speed and movement...

Page 9: ... and TB104 2L respectively as well as to DI1 0 of PLC200 input through TB201 1 o Check if the 1L terminal of PLC200 output side is connected to 24VDC through the line TB108 1L o Check if the line TB203 2 is connected between DO1 2 of PLC200 output and SOL254 Ensure that the SOL254 is grounded to 0VDC through TB110 2L Clamp does not raise DO WE HAVE INPUTS FOR CLAMP AND WATER o Check if the 1L term...

Page 10: ...in the SawVFD_FaultCode watch table and contact BACA Carriage motor is not turning right or left o Try resetting the machine with the Reset Push Button on the Panel o Check the conditions of the Left and Right Limit Sensors and make sure they re intact and free from dust o Enable the Web Access for the PLC200 as shown in the MiterX Service Manual o Check for Input Output issues in the InputOutput_...

Reviews: