NOTE:  To place a zone on hold for testing, start at the Normal Operating Screen.  Using the 
arrow key, move the cursor to the right to cover the list of zones.  Then, using the up and 
down arrow keys, select the zone to be put in hold mode.   When you have the cursor on 
the target zone, press enter until you hear a beep (about 1 second).  The zone will remain 
on hold for 15 minutes or until you release it using the selection method above to release. 

14.

PERFORM BUMP TESTS:  Gas test (or “bump test”) each zone using the bump gas method described below

 

to ensure that the monitor is operating properly, the alarms operate, and that each zone’s gas path is clear.

a.

This procedure uses “bump gas” (

Difluoroethane

) as an inexpensive test gas.  Virtually any brand of

 

keyboard cleaner or “canned air” (readily available at most computer and variety stores) contains

 

this refrigerant and is sufficient to perform a bump test.

b.

Power up the HGM-MZ monitor.  The green LED on the monitor will blink until the warmup cycle is

 

complete.

c.

Locate and identify the zone to be checked.

d.

Either put the target zone on hold for continuous operation, or wait until the monitor is polling that

 

specific zone.

e.

Have someone view the information at the monitor for the zone to be tested, and at the same time

 

have a technician dispense the bump gas.  The technician should release a 2-second burst of gas

 

directed at the test zone pickup while the monitor is polling that zone.

f.

After a short delay, the monitor will indicate the presence of gas on that zone.  The PPM reading

 

will 

vary as this is not a regulated gas application.

g.

If no refrigerant is detected by the monitor, the tubing needs to be inspected for an open or

 

blocked 

pathway.  If the tubing was pinched or plugged, the monitor will show a flow fault
(indicating a flow-related problem) in addition to no refrigerant being detected for that zone.

15.

FINAL CHECK:  Take the monitor in and out of service mode.  This will cause a purge and pressure check.  It

 

will also allow the monitor to cycle through all zones for a final check.

16.

SAMPLE SCREEN:  Finish by putting the monitor into service by returning the display to the sampling screen.

   

   

 

Headquarters: 

621 Hunt Valley Circle, New Kensington, PA 15068-7074 

Toll Free: 1-800-736-

4666 • 

Tel: +1-724-334-

5000 • Fax: 

+1-724-334-5001 

Website: www.MyBacharach

.com • E

-mail: help@MyBacharach.com 

Printed in U.S.A. 

® Registered Trademark of Bacharach Inc. 

Summary of Contents for HGM-MZ

Page 1: ...all internal wiring terminations and connections 6 RUN SAMPLE TUBING Locate the positions of remote air sample points and run air sample tubing back to the monitor making note of the length of the tu...

Page 2: ...ces End of Line Filter for Dry Locations Figure 3 Best Practices End of Line Filter for Wet Locations Splash Guard Accessory Part Number 3015 5748 8 CONNECT TUBING Connect tubing to the monitor using...

Page 3: ...the monitor must be put in service mode when refrigerant is released e g during maintenance to prevent premature purge filter contamination See Figure 7 Figure 6 Outdoor Filter Mounting Example Optim...

Page 4: ...HGM MZ Refrigerant Monitor Quick Start Installation Instructions Revision 2 4 P N 3015 9003 Figure 8 Chiller Installation Example Figure 9 Typical Refrigeration Rack Installation...

Page 5: ...nes refrigerant type alarm limits and sample lengths for each zone If splitters are used on one or more zones a Be sure to keep tubing lengths the same beyond the splitter b DISTANCE total for a parti...

Page 6: ...HGM MZ Refrigerant Monitor Quick Start Installation Instructions Revision 2 6 P N 3015 9003 Figure 11 Configuring the Number of Installed Zones Figure 12 Accessing the Zone Setup Screen...

Page 7: ...ion 2 7 P N 3015 9003 Best Practice Tip Press the right arrow button twice to move to the next zone Figure 13 Zone Setup Directions Figure 14 Splitter Example Illustrating Proper Tubing Length Practic...

Page 8: ...Either put the target zone on hold for continuous operation or wait until the monitor is polling that specific zone e Have someone view the information at the monitor for the zone to be tested and at...

Reviews: