background image

The following three items are supplied in all digital sets:

• EZ Command train controller
• Mains plug power transformer
• Red wire and track clip

A Speed control knob

B  Direction control

C Red lead jack plug

D  Red lead

E  Track clip

Connecting the Power (for DCC train sets)

Ensure the train speed controller knob (A) is set in the zero position. Connect the power 
connecting track clip by pushing into appropriate holes in track base (E) and fit to the track 
as shown in (Fig.5). Connect red wire to track clip. Place the jack plug (C) at the end of the 
red wire into the socket marked with the track symbol on the train controller. Connect the 
jack plug from the wall transformer into the train controller, and locate a suitable mains wall 
socket. Do not plug the transformer into the socket at this stage.

Carefully place only the locomotive (and tender if permanently attached) onto the track, 
making sure to check that all wheels are correctly placed on the rails.

ATTENTION PARENTS!

WARNING: To reduce the risk of fire or electrical shock, do not expose the controller or mains transformer to rain or 
moisture. Suitable for indoor use only.

CAUTION: To avoid the risk of electric shock, never remove the plastic covers of the controller or mains transformer. 
Refer any servicing to qualified service personnel.

CAUTION:  To  prevent  electric  shock,  do  not  connect  the  controller  or  mains  transformer  to  an  AC  outlet  in  the 
bathroom, near a sink, or in any other damp area.

CAUTION: To prevent electric shock, fire or personal injury, do not operate controller or mains transformer when the 
power cord or cover is damaged. Periodic examination of both units is recommended.

Operation

Place your locomotive on the track, ensuring the bottoms of all wheels are in contact with the top surface of the track (Fig.6).

Plug the mains transformer into the wall socket and switch on. Gradually turn the speed control dial on the train controller. 

Once the locomotive has been ‘run-in’ (see below), you can place the additional coaches or wagons provided in the set 
onto the track, ensuring they run smoothly, by gently pushing back and forth. Couple the coaches or wagons together 
with the locomotive. The couplers will engage automatically (Fig.7).

Do not leave your train running unattended. Unplug the mains power transformer when not in use.

Fig.4

Fig.5

Fig.6

Fig.7

Fault Finding Checklist

SHOULD YOU EXPERIENCE ANY PROBLEMS WITH YOUR TRAIN, 

PLEASE CONSULT THIS FAULT FINDING CHECK LIST.

1. Make sure the mains transformer pack is plugged in.

2. Make sure all locomotive and coach/wagon wheels are on the track.

3. Check to make sure all wiring is secure and there are no crossed wires.

4. Check to make sure the track is properly assembled.

5. If your train hits a bump or derails anywhere along the track, that section of track may not be properly seated in 
the fishplate. Make sure all the track is properly linked together. Refer to previous track assembly instructions.

6. The mains transformer may be warm to the touch. If you feel that it is excessively hot, switch mains supply off 
immediately, and consult your model store, or contact the Bachmann Service Department on 01455 245575.

Short Circuits

If your train stops or fails to start, an electrical short circuit may have 
occurred. Unplug the mains transformer at once. Derailed wheels 
my cause an electrical short, so check that all wheels are correctly 
seated on the track. Check all connections and ensure that no 
metal of any sort is across the rails (Fig.9).

NOTE: Your  mains transformer is protected by a circuit breaker that 

automatically resets after a short circuit is corrected. Allow up to 15 

minutes for circuit breaker reset before resuming operation.

Fig.9

Cleaning & Maintenance

Please take care when removing your model from its packaging. Lift carefully, do not pull by the buffers or locomotive 
valve gear. Packaging should be retained for safe storage of your model when not in use.

Do not run your model using track laid on carpet as dust and fibres may enter the working parts of your model. Care must 
be taken to clean and maintain your train for optimum performance. After eight hours of use, wipe the track rails and 
exposed portions of your locomotive’s wheels with a soft, lint-free cloth or cotton swap to ensure good electrical contact. 
Please note a black residue may appear on the cloth.

DO NOT USE STEEL WOOL TO CLEAN YOUR TRACK.

If your track should become very dirty and dull looking, clean it with one of the recommended track cleaners available 
at your local hobby retailer. (Common solvents are not recommended, they may damage plastics). Make sure your track 
is free from lint, fibre and loose materials which may foul the locomotive motor.

Lubrication

All Bachmann Branchline locomotives are supplied ready lubricated and can be used straight from the box. Over time 
your locomotive will require some additional lubrication, when will depend on the frequency of use and storage, so 
please inspect your model on a regular basis.

Please note: A plastic compatible lubricant is required. Suitable products from both the Bachmann Trains and Woodland 
Scenics ranges are available from your local Bachmann retailer.

Running In

It is necessary that this locomotive is ‘run-in’ to allow the mechanism and gears to settle. This requires the model to be run 
without a load (wagons, coaches, etc.) for 30 minutes in each direction at half speed.

Storage

It is important to retain your Bachmann train set box and associated information for future reference and storage.

NOTE: Please read the EZ Command Controller instructions enclosed with this train set

A

C

B

E

E

Branchline DCC train set instructions.indd   2-3

03/08/2017   14:55

Reviews: