background image

TRACKSIDE TURNOUT DCC DECODER INSTRUCTIONS

Thank you for your purchase of the DCC Trackside Turnout Decoder.  

This product is designed for you to easily upgrade your analog (switchbox operated) turnouts to DCC operation. 

Included in package: 

• 1 trackside structure with DCC decoder 

• 1 E-Z Track

®

 red power wire

• 1 piece of double-stick tape

• 1 instruction sheet 

SETUP WITH BACHMANN’S 

E-Z TRACK

®

 SYSTEM

To begin, first turn off power to your layout and DCC system to prevent any short-circuits during installation. Then, connections to 

the trackside structure can be made. If using the Bachmann E-Z Track

®

 system, installation is plug-and-play (alternatively, solder 

connections can be made if desired). To connect the trackside structure to your layout with E-Z Track

®

 connectors, use a pair of  

pliers to remove the break-off tabs on both sides of the structure, as shown in the diagram below. After breaking off the tabs, any 

excess plastic can be trimmed with a standard hobby knife.  

If your turnout is currently connected to a switchbox controller on your layout, remove the plug with the green wire from the  

switchbox, then, on the underside of the structure, connect the green wire’s plug to the board’s three-prong connection.

The new red wire (supplied) connects to the two-prong side of the structure, and the opposite end connects to any open connection 

on a power terminal rerailer track that is powered by a DCC system. Make sure all plug connections are secure by firmly pressing 

the plugs over the prongs. Once wired, the double-stick tape (supplied) can be used to affix the structure to your layout.

If you wish to hide the connection wires under your layout, feed the wires through a hole in your layout drilled under or near the 

structure.

Remove break-off tabs (both sides)  

for E-Z Track

®

 installation

Shown with break-off tabs removed

Bachmann E-Z Track

®

 Shown

If already installed on existing layout with 
switchbox control, remove the green wire  
from switchbox and firmly connect to the  
three prong side of trackside building.

Green three-wire plug connection  

from E-Z Track

®

 turnout

Red two-wire plug connection to  
E-Z Track

® 

power terminal rerailer

1400 East Erie Avenue, Philadelphia, PA 19124 

www.bachmanntrains.com

Printed in China 

 

 

 

 

 

 

 

 

 

       

 

             H4950-IS001

Reviews: