LAG SCREW
WH 5/16x2 1/2
(2)
WASHER
LOCK EXT
8x19
(2)
(1) - ROCK LADDER ASSEMBLY
STEP 28
CENTER LADDER ON 'M13' BOARD AND PILOT DRILL 3/16" HOLES FOR LADDER
ATTACHMENT.
ATTACH THE ROCK LADDER ASSEMBLY TO M13 FLOOR RAIL SUPPORT USING (2)
2-1/2" LAG SCREWS AND LOCK WASHERS, AS SHOWN.
M13
LAG SCREW WH 5/16x2 1/2
(2 PLCS)
WASHER LOCK EXT 8x19
(2 PLCS)