STEP 39
Attach six M6 Wall Boards and one N2 on back
left placing three M6s, then one N2 and the
remaining three M6s then Space evenly and
Fasten using 1-1/4” Wood Screws in Bottom Rail
and 1-1/2” Wood Screws in Top Rail.
STEP 40
Install 5/16” Spike T-Nuts inside C3 Posts and attach H9 using 5/16 x 3-3/4” Hex Bolts, Internal Tooth Lock Washers
and Flat Washers. Measure up 3-1/2” from top of H7 Floor Rail and mark C3 Post. Now attach H9 with bottom of H9
Wall Rail at marks on Post, pilot drill using 3/16" bit and attach using 2-1/2” Lag Screws, Internal Tooth Lock
Washers and Flat Washers. Make sure that H9 is flush with outside of C3. Now attach six M9 Wall Boards to H9
Wall Rails on right side of Tower spacing approximately 2-3/4” apart using 1-1/2” Wood Screws.
M6
M6
N2
G2
C3
C3
M9
M9
M9
M9
M9
M9
1 x 3-1/2 x 45 [ 2.54 x 8.89 x 114.30 ]
H9 Wall Rail * 2 Holes * 2 Req
11/16 x 3-3/8 x 29 [ 1.74 x 8.57 x 73.66 ]
M6 Club House Wall Board * 4 Holes * 28 Req
11/16 x 3-3/8 x 23 [ 1.74 x 8.57 x 58.42 ]
M9 Wall Board * 4 Holes * 23 Req
11/16 x 2-1/2 x 29 [ 1.74 x 6.35 x 73.66 ]
N2 Club House Wall Board * 2 Holes * 3 Req
5/16 X 3-3/4"
HEX
HEAD
BOLT
5/16"
SPIKE TEE
NUT
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
#8 X 1-1/2"
WOOD
SCREW
#8 X 1-1/4"
WOOD
SCREW
5/16 X 2-1/2"
LAG
SCREW
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
3 ½"
H9
H7
H9
Page 28
Back
M6
M6
M6
M6
N2
N2
Meijer.com
Summary of Contents for Cedar Mountain 5007
Page 3: ...Meijer com...