© Copyright Playground Inc
(R1) Roof Sub Panel
(R2) ROOF PANEL
R1
R2
R1
1-1/4"
1-1/4"
1-1/2"
OVERLAP
1/4"
GREEN
FLAT
WASHER
#8 X 3/4
WASHER
HEAD
SCREW
"
#8 X 1-1/2
GREEN
WASHER
HEAD
SCREW
"
STEP 4
Now attach White Roof Sub-
Panels R1 to F1 Rafter
Assemblies overlapping the left
and right of Clubhouse
approximately 1-1/2”. Note:
The Sub-Roof Panel will hang
down over H1 Roof Rail so that
Sub-Roof Panel will be flush at
Peak of Roof Assembly. Attach
using 3/4” Washer Head
Screws, one at the bottom of
one of the Center Rafters and
one at the top of the other
Center Roof Rafter.
Repeat this procedure
on the other side.
STEP 5
Now place Green R2 Roof Panel
on top of Sub-Roof Panel and
push tight at bottom and edges,
up until flush. Now attach to
Rafters using 1-1/2” Green
Washer Head Screws and Green
Washers in pre-drilled holes of
R2. You may need to angle
screws to hit Rafters. You may
also need to pull the Green
Panels over the lips of the White
Panel to cover them.
Meijer.com
Summary of Contents for Cedar Mountain 5007
Page 3: ...Meijer com...