Fort Assembly
Phase 3
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (1) G1 - SWING BEAM MOUNT - W101495
• (2) L3 - WALL RAIL - W101489
• (1) M6 - FLOOR RAIL - W101447
• (2) M8 - WALL RAIL - W101454
• (1) K3 - ARCHED WALL BOARD - W101456
• (2) K2 - BASE BOARD - W101452
Hardware needed:
• (8) BG - T-NUT 5/16 - H100074
• (4) T - BOLT WH 5/16x4 - H100020
• (26) Z - LAG SCREW WH 5/16x2 - H100027
• (30) AC - WASHER LOCK EXT 8X19 - H100030
Step 1: Attach 'G1' Swing Beam
Mount to 'E1' & 'E2' Tower Legs
using Bolts 'T', Washer 'AC' and
T-Nuts 'BG', as shown.
T
AC
Z
AC
G1
E2
E1
BG
L3
M6
Z
AC
K2
Z
AC
L3
Z
AC
E3
E3
Z
AC
Z
AC
Z
K2
M8
K3
M8
AC
AC
AC
Note: It is vital that the fort
be level before and after
each phase of assembly.
BG
AC
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 2: Pre-Drill &
attach 'L3' Wall
Rail to 'E1' & 'E2'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
Step 3: Pre-Drill &
attach 'M6' Floor
Rail to 'E1' & 'E2'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
Step 4: Pre-Drill & attach 'K2'
Floor Board to 'E1' & 'E2' Tower
Legs using Lag Screws 'Z' and
Washers 'AC', as shown.
Step 5: Pre-Drill & attach 'K2'
Floor Board to 'E3' Tower Legs
using Lag Screws 'Z' and
Washers 'AC', as shown.
Step 6: Pre-Drill &
attach 'M8' Wall
Rails to 'E3'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
Step 7: Pre-Drill &
attach 'K3' Arched
Wall Board to 'E3'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
Step 8: Pre-Drill & attach 'L3' Wall
Rail to 'E3' Tower Legs using Lag
Screws 'Z' and Washers 'AC', as
shown.