Phase Notes
• Assemble with hardware as shown.
Fort Assembly
Phase 4
Parts needed:
• (2) F1 - DECK BRACE - W101504
Hardware needed:
• (2) H - BOLT WH 5/16x1-1/2 - H100010
• (4) AC - WASHER LOCK EXT 8x19 - H100030
• (2) AD - WASHER LOCK EXT 12x19 - H100031
• (2) D - NUT BARREL WH 5/16x7/8 - H100005
• (2) Z - LAG SCREW WH 5/16x2 - H100027
Step 1: Attach 'F1' Deck Braces to 'M6'
Floor Rail using Bolt 'H', Washers 'AC'
& 'AD' and Nut Barrel 'D', as shown.
M6
H
AC
D
AD
Z
AC
F1
F1
E2
E1
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 2: Attach 'F1' Deck Braces to 'E1'
& 'E2' Tower Legs using Lag Screws 'Z'
and Washers 'AC', as shown.